Poolbeg BESS, Ireland
Project Name
Poolbeg BESS, Ireland
Client:
Electricity Supply Board
Main Contractor:
Kirby
Consultant:
ESB Engineering & Major Projects
Project:
Poolbeg BESS EBoP Works
Location:
Ringsend, Dublin
Value:
€9m
Sectors:
Power and Renewables
Services:
HV/MV Services
PROJECT DESCRIPTION
Kirby was responsible for the design and build of the electrical system associated with the 75MW Poolbeg Battery Energy Storage System (BESS) Plant connecting to the Eirgrid 220kV system via the Poolbeg 220kV substation. The scope of works included electrical and civil works associated with the electrical balance of plant, including design, procurement, installation and erection, testing and commissioning of works and civil and electrical works for all the BESS equipment. A 220kV underground gridline circuit was successfully installed through the main roads within the existing power plant, navigating the many services encountered to successfully achieve a highquality installation in a highly congested operational brownfield site.
SCOPE OF WORKS
Kirby was responsible for the electrical and civil scope of works.
- Primary Equipment Transmission Connection
- Earthing & Bonding
- Control & Protection System
- MV Cable Connection System
- Fibre Network
- Distribution Underground Cables
- DC Battery Systems (Battery Storage technology by other contractors)
- General & Emergency Lighting
- General Service Power
- Mechanical Plant Service Power
- Fire Detection & Alarm
- Intruder & CCTV (1st fix)
- Voice & Data Distribution
- Lightning Protection
- SCADA
- Full design and build of the civil scope of works including civil gridline works related to the 220kV transmission line.
Installed plant items include 4 nr. distribution boards, 18 nr. control & protection panels, 2 nr. battery systems and 3 nr. transformers.
The total project meterage consisted of 7,500m of cable and 46 sets of joints and terminations.