Adare Manor, Ireland
Project Name
Adare Manor, Ireland
Client:
Adare Manor
Main Contractor:
John Paul Construction
Consultant:
Arup
Project:
Adare Manor Redevelopment
Location:
Limerick, Ireland
Value:
€27m
Sectors:
Commercial
Services:
Electrical Services and Instrumentation, Mechanical Piping & HVAC Services, and Off-Site Manufacturing
PROJECT DESCRIPTION
Kirby delivered full mechanical and electrical services on Adare Manor, a five star award-winning hotel redevelopment within a highly complex protected building structure.
The labour on site peaked at 215 and the project involved works on 9 buildings – the redevelopment of existing manor house, construction of a new 90-bedroom wing, energy centre, ballroom, golf club, facilities complex and all associated external lighting.
SCOPE OF WORK
Kirby scope of works included the installation and commissioning of all electrical and mechanical services.
The electrical systems installed by Kirby included:
• MV Distribution
• LV Distribution
• Generator
• UPS
• General & Emergency Lighting
• General Service Power
• Mechanical Plant Service Power
• Fire Detection & Alarm
• Access Control, Intruder & CCTV
• Earthing & Bonding
• Voice & Data Distribution
• Lightning Protection
• Room Automation System
The mechanical systems installed by Kirby included:
• Chilled Water
• Low Temperature Hot Water
• Smoke & Heat Exhaust Ventilation
• Supply & Extract Ventilation Distribution
• Fire Suppression
• DWS
• VRF Air Conditioning
• Leak Detection
• BMS
• Server Room Air Conditioning
• Rain Water Harvesting
• Gas
• Soils & Wastes
• Domestic Water Services
• Compressed Air
Installed plant items included CHP, generators, switchgear, UPS, boilers, chillers, calorifers, FCUs extract fans, AHUs, AC and pumps.