One Microsoft Court, Ireland
Project Name
One Microsoft Court, Ireland
Client:
Confidential
Main Contractor:
MAC Group
Consultant:
JV Tierney
Project:
One Microsoft Court Office Upgrade
Location:
Dublin, Ireland
Value:
€7m
Sectors:
Commercial
Services:
Mechanical Piping & HVAC Services and Off-Site Manufacturing
PROJECT DESCRIPTION
Kirby was responsible for the upgrade of the mechanical and electrical services at the office development. The building consists of 10,000m2 over 4 levels with works completed on a live campus. The project was fully coordinated using BIM LOD500. A collaborative approach between Kirby and the design team eradicated any delays and gave the architect an understanding on how the electrical and mechanical services could be integrated.
SCOPE OF WORK
The Kirby scope of works included the electrical and mechanical services.
The electrical systems installed by Kirby included:
- LV Distribution
- General & Emergency Lighting
- General Service Power
- Mechanical Plant Service Power
- Fire Detection & Alarm
- Earthing & Bonding
- Voice & Data Distribution
The mechanical systems installed by Kirby included:
- Chilled Water
- Low Temperature Hot Water
- Smoke & Heat Exhaust Ventilation
- Supply & Extract Ventilation Distribution
- DWS
- VRF Air Conditioning
- Leak Detection
- BMS
- Server Room Air Conditioning
- Soils & Waste
- Domestic Water Services
Installed equipment and plant items included new distribution boards, new VRF units and condensers, AHU.
The total project meterage consisted of 2km of pipework, 4,888m² of ductwork.