Office of Public Works, Ireland

Project Name

Office of Public Works, Ireland

Client:

Office of Public Works

Main Contractor:

Flynn

Consultant:

METEC Consulting Engineers

Project:

Tenant Fitout 2nd and 3rd Floors

Location:

Dublin, Ireland

Sectors:

Commercial

Services:

Mechanical Piping & HVAC Services

PROJECT DESCRIPTION

Kirby was responsible for the installation of mechanical services for the project at George’s Quay, Dublin 2.

The project involved alterations to the existing office and new fit-out installation of the second and third floors. This included all new mechanical services such as HVAC, Piping, Fire Suppression System and integration of the existing BMS system to new equipment and controls.

SCOPE OF WORKS

Kirby was responsible for the mechanical scope of works.

The mechanical systems installed by Kirby included:

  • Chilled Water
  • Low Temperature Hot Water
  • Supply & Extract Ventilation Distribution
  • Fire Suppression
  • Leak Detection
  • BMS
  • Server Room Air Conditioning
  • FCU
  • Soils & Wastes
  • Domestic Water Services

Installed plant items included FCU’s, Air Conditioning Units, Supply and Exhaust Fans, Valves, Attenuators, Grilles, ZIP Taps, Inline Heaters, BMS Devices, Fire Suppression System.

 