Allergan, Ireland
Project Name
Allergan, Ireland
Client:
Allergan
Main Contractor:
Fluid Engineering (Pilot Plant)
Consultant:
IPS (Pilot Plant) and MEA (BIM Ring Facility)
Project:
New Oral Solid Dosage Plant & BIM Ring Facility
Location:
Dublin, Ireland
Value:
€6m
Sectors:
Life Sciences
Services:
Electrical Services and Instrumentation and Mechanical Piping & HVAC Services
Kirby has completed a number of projects for Allergan Biologics at their facilities in Westport and Dublin, Ireland.
The total value of projects completed for Allergan by Kirby is €25m.
Please see below details of two recent projects that Kirby has completed for Allergan Biologics.
Allergan Biologics
MAIN CONTRACTOR: Sisk
CONSULTANT: RPS Engineering
PROJECT: Biologics 2
VALUE: €15m
LOCATION: Mayo, Ireland
SERVICES: Mechanical Piping & HVAC Services
PROJECT DESCRIPTION
Allergan, a leading pharmaceutical company invested €42m in its Irish operations to increase production capacity.
Kirby was responsible for the installation and commissioning of all mechanical and electrical services for the Pilot Plant and BIM Ring Facility in Dublin. Kirby implemented 3D BIM co-ordination which ensured successful project delivery. Kirby acted as PSCS for both projects and also performed the Construction Management role on the BIM Ring project.
SCOPE OF WORK
Kirby was responsible for the installation and commissioning of mechanical and electrical works.
The electrical systems installed by Kirby included:
• LV Distribution
• General and Emergency Lighting
• General Service Power
• Mechanical Plant Service Power
• Fire Detection and Alarm
• Access Control, Intruder and CCTV
• Earthing and Bonding
• Voice and Data Distribution
• EMS
• Atex Zone 2/22 Installation and Atex Inspections
• Vendor Cabling Installation
The mechanical systems installed by Kirby included:
• Chilled Water
• Low Pressure Hot Water System
• Supply and Extract Ventilation Distribution
• DWS
• BMS
• QBMS
• NQBMS
• Trox VAV and CAV’s
• Clean Steam
• Wash In Place (WIP)
• Lab Purified Water
• Process Water
• Purified Water
• Hot Process Water
• Compressed Air
• Steam
• Gas
• Soils and Wastes
• Domestic Water Services
• Stainless Exhaust
The existing LPHW boiler, header and control system and CHW header was replaced. Kirby installed a new 1,040kW chiller and 2 no 1,200kW boilers.
The total project meterage consisted of 33,000m of cable, 1,300m of containment, 414 I/O points; 1,386m black utilities pipework, 258m of plastic pipework, 906m of copper pipework, 987m of 2 clean pipework and 3,170m² ductwork.
New Oral Solid Dosage Plant & BIM Ring Facility
MAIN CONTRACTOR: Fluid Engineering (Pilot Plant)
CONSULTANT: IPS (Pilot Plant) and MEA (BIM Ring Facility)
PROJECT: New Oral Solid Dosage Plant & BIM Ring Facility
VALUE: €6m
LOCATION: Dublin, Ireland
SERVICES: Electrical Services and Instrumentation, Mechanical Piping & HVAC Services
PROJECT DESCRIPTION
Allergan, a leading pharmaceutical company invested €42m in its Irish operations to increase production capacity.
Kirby was responsible for the installation and commissioning of all mechanical and electrical services for the Pilot Plant and BIM Ring Facility in Dublin. Kirby implemented 3D BIM co-ordination which ensured successful project delivery. Kirby acted as PSCS for both projects and also performed the Construction Management role on the BIM Ring project.
SCOPE OF WORK
Kirby was responsible for the installation and commissioning of mechanical and electrical works.
The electrical systems installed by Kirby included:
• LV Distribution
• General and Emergency Lighting
• General Service Power
• Mechanical Plant Service Power
• Fire Detection and Alarm
• Access Control, Intruder and CCTV
• Earthing and Bonding
• Voice and Data Distribution
• EMS
• Atex Zone 2/22 Installation and Atex Inspections
• Vendor Cabling Installation
The mechanical systems installed by Kirby included:
• Chilled Water
• Low Pressure Hot Water System
• Supply and Extract Ventilation Distribution
• DWS
• BMS
• QBMS
• NQBMS
• Trox VAV and CAV’s
• Clean Steam
• Wash In Place (WIP)
• Lab Purified Water
• Process Water
• Purified Water
• Hot Process Water
• Compressed Air
• Steam
• Gas
• Soils and Wastes
• Domestic Water Services
• Stainless Exhaust
The existing LPHW boiler, header and control system and CHW header was replaced. Kirby installed a new 1,040kW chiller and 2 no 1,200kW boilers.