Project:
Castlepook and Ballyhoura 38kV Windfarms
Location:
Cork, Ireland
Value:
€6m
Sectors:
Power and Renewables
Services:
HV/MV Services
PROJECT DESCRIPTION
On this Windfarm project, Kirby was responsible for the design and build of 2 number 38/20kV substations (ESBN & IPP sides) and the installation and testing of MV radial cabling feeding 14 number turbines for Castlepook 33MW windfarm and 6 number turbines for Ballyhoura 19MW windfarm.
Kirby successfully achieved an accelerated project delivery timeline and delivered the project 3 months ahead of schedule, safely.
SCOPE OF WORK
Kirby scope of works included the Electrical Balance of Plant (EBoP) contract of 2 windfarms (Castlepook and Ballyhoura) and associated ESBN contestable works .
Design, procurement, installation and commissioning of the 38kV Streamhill Substation for ESBN and the 38/20kV Castlepook Substation for ESB Wind.
• 1 number 38kV AIS Tail Fed Substation
• 1 number 38/20kV 40 MVA Power Transformer
• 20kV AIS Switchgears
• Complete Control and Protection systems for ESBN and ESB Wind
• Telecom, SCADA System for the Windfarms
• AC and DC Systems
• General Services and CCTV
• Emergency Generator
• Civil works: Trafo bunds, Plinths, Control Building and Compound
• 20kV MV Collector and Fibre Optic for the Castlepook Windfarm
Design, procurement and commissioning of the 38kV Knockafutera Substation for ESBN and the 38/20kV Knocknatallig Substation for Brookfield.
• 4 number 38kV Bays
• 1 number 38kV Busbar
• 1 number 38/20kV 25 MVA Power Transformer
• 20kV AIS Switchgears
• Complete Control and Protection systems for ESBN and Brookfield
• Telecom, SCADA System for the Windfarms
• AC and DC Systems
• General Services and CCTV
• Emergency Generator
• Civil works: Trafo Bunds, Plinths, Control Building and Compound
• 20kV MV Collector and Fibre Optic for the Ballyhoura Windfarm
A total of 40km of 20kV Power Cable installed for the 2 windfarms.