Confidential Data Centre, Ireland

Project Name

Confidential Data Centre, Ireland

Client:

Confidential

Main Contractor:

Structure Tone

Consultant:

John Dunton Associates

Project:

Confidential

Location:

Dublin, Ireland

Value:

€4m

Sectors:

Data Centres

Services:

Electrical Services and Instrumentation, Mechanical Piping & HVAC Services, and Off-Site Manufacturing

PROJECT DESCRIPTION

Kirby was appointed to complete the mechanical and electrical scope of works for phase 1 of the new data centre facility.
Large scale off-site fabrication was utilised on this project which ensured the project was delivered on schedule and to the highest safety and quality standards.

SCOPE OF WORKS

Kirby was responsible for the mechanical and electrical scope of works.

The electrical systems installed by Kirby included:

  • MV Distribution
  • LV Distribution
  • Generator
  • General & Emergency Lighting
  • General Service Power
  • Mechanical Plant Service Power
  • Fire Detection & Alarm
  • Access Control, Intruder & CCTV
  • Earthing & Bonding
  • Lightning Protection

The mechanical systems installed by Kirby included:

  • Chilled Water
  • Supply & Extract Ventilation Distribution
  • VRF Air Conditioning
  • Leak Detection
  • Server Room Air Conditioning
  • Humidification Water
  • RO Water
  • Soils & Wastes
  • Domestic Water Services

Installed equipment and plant items include LV & MV Switchgear, 4,000A Busbar System, Humidifiers, M-Houses, AHU’s, RO Unit, Leak Detection, Trace Heating, Pressurisation Units, Chillers, Generators, E-Pods, CRAHs, Transformer’s, Marshalling Panels.
The total project meterage consisted of 60,000m of cable, 50,000m of containment, 2,840 of pipework, 1,400m2 of ductwork and 300 no. of instruments and loops.