Related Projects
Related Projects
<  Back to Projects

Docusign, Dublin, Ireland

Docusign, Dublin, Ireland

    • CLIENT:
    • DocuSign
    • MAIN CONTRACTOR:
    • MAC Group
    • CONSULTANT:
    • Axis Engineering
    • PROJECT:
    • DocuSign - Office Fit - Out
    • VALUE:
    • €3.5m
    • SECTOR:
    • Commercial
    • LOCATION:
    • Dublin, Ireland

PROJECT DESCRIPTION

Kirby was appointed to complete the mechanical and electrical office fit-out to four floors. Each floor consisted of various sized meeting rooms and open plan desks.

SCOPE OF WORKS

Kirby was responsible for the mechanical and electrical scope of works.

The electrical systems installed by Kirby included:

  • LV Distribution
  • General and Emergency Lighting
  • General Service Power
  • Mechanical Plant Service Power
  • Fire Detection and Alarm
  • Earthing and Bonding

The mechanical systems installed by Kirby included:

  • Chilled Water
  • Low Temperature Hot Water
  • Supply and Extract Ventilation Distribution
  • Leak Detection
  • BMS
  • Server Room Air Conditioning
  • Soils and Wastes
  • Domestic Water Services

Installed equipment and plant items include Comms Room Sub Boards and Fan Coil Units.

The total project meterage consisted of:

  • 46,000m of cable
  • 1,500m of containment
  • 4,800m of pipework