East-West Interconnector, Ireland
Project Name
East-West Interconnector, Ireland
Client:
EirGrid
Main Contractor:
ABB (EPC)
Project:
East-West Interconnector
Location:
Meath, Ireland
Value:
€4m
Sectors:
Power and Renewables
Services:
HV/MV Services
PROJECT DESCRIPTION
Kirby were appointed by ABB to build the AC/DC convertor station to support the 500MW HVDC Interconnector project between Ireland and the UK. We were responsible for the construction and pre-commissioning of Portan 400kV AIS substation to EirGrid functional specifications, as well as installation of 400/260kV 560MVA transformers, 400kV and 260kV switchgear and filters, 260kV reactor and construction of AC/DC valve hall (including cooler system).
SCOPE OF WORK
Kirby scope of works included construction and pre-commissioning of the following works:
• Primary Equipment Transmission Connection
• Primary Equipment Distribution Connection
• Earthing & Bonding
• Control & Protection System
• MV Cable Connection System
• Fibre Network
• OHL
• Transmission Underground Cables
• Distribution Underground Cables
• DC Battery Systems
• Generator
• UPS
• Mechanical Plant Service Power
• Access Control, Intruder & CCTV
• Lightning Protection
Installed plant items included 4 number transformers, switchgear systems, AC/DC distribution boards, 25 number control and protection panels, battery systems.
The total project meterage consisted of 15,000m of cable and 6 number of terminations.