Related Projects
Related Projects
<  Back to Projects

East-West Interconnector, Ireland

East-West Interconnector, Ireland

    • CLIENT:
    • EirGrid
    • MAIN CONTRACTOR:
    • ABB (EPC)
    • PROJECT:
    • East-West Interconnector
    • VALUE:
    • €4m
    • SECTOR:
    • Substations and Renewables
    • LOCATION:
    • Meath, Ireland

PROJECT DESCRIPTION

Kirby were appointed by ABB to build the AC/DC convertor station to support the 500MW HVDC Interconnector project between Ireland and the UK. We were responsible for the construction and pre-commissioning of Portan 400kV AIS substation to EirGrid functional specifications, as well as installation of 400/260kV 560MVA transformers, 400kV and 260kV switchgear and filters, 260kV reactor and construction of AC/DC valve hall (including cooler system).

SCOPE OF WORK

Kirby scope of works included construction and pre-commissioning of the following works:

• Primary Equipment Transmission Connection
• Primary Equipment Distribution Connection
• Earthing & Bonding
• Control & Protection System
• MV Cable Connection System
• Fibre Network
• OHL
• Transmission Underground Cables
• Distribution Underground Cables
• DC Battery Systems
• Generator
• UPS
• General & Emergency Lighting
• General Service Power
• Mechanical Plant Service Power
• Fire Detection & Alarm
• Access Control, Intruder & CCTV
• Voice & Data Distribution
• Lightning Protection

Installed plant items included 4 number transformers, switchgear systems, AC/DC distribution boards, 25 number control and protection panels, battery systems.

The total project meterage consisted of 15,000m of cable and 6 number of terminations.