Global Switch, Netherlands
Project Name
Global Switch, Netherlands
Client:
Global Switch
Consultant:
Royal Haskoning DHV
Project:
AMS B05
Location:
Amsterdam, Netherlands
Value:
€4m
Sectors:
Data Centres
Services:
Electrical Services and Instrumentation, Mechanical Piping & HVAC Services, and Off-Site Manufacturing
PROJECT DESCRIPTION
Kirby was appointed to complete the turnkey design and build from RIBA Stage 3 involving the CSA and MEP fit-out of an existing suite within a live data centre.
The project involved the integration of services within a live facility, modifications to existing owner furnished equipment and the supply and installation of new equipment.
Pre-fabrication of pipework and modularisation of the plant room ensured design optimisation, reliability and the efficient delivery of an agreed accelerated program.
SCOPE OF WORK
Kirby was responsible for the mechanical and electrical scope of works.
- The electrical systems installed by Kirby included:
- LV Distribution
- UPS
- General & Emergency Lighting
- General Service Power
- Mechanical Plant Service Power
- Fire Detection & Alarm
- Access Control, Intruder & CCTV
- Earthing & Bonding
- Lightning Protection
The mechanical systems installed by Kirby included:
- Chilled Water
- Smoke & Heat Exhaust Ventilation
- Fire Suppression
- DWS
- Leak Detection
- BMS
- Server Room Air Conditioning
- Scada
- Soils & Wastes
- Process Chilled Water
Installed equipment and plant items included UPS, DB’s, Lighting, Pump Room, DX Splits and BMS Panels.
The total project meterage consisted of 2,200m of cable, 1,400m of containment, 500m of pipework and 80 no. of I/O points.