PROJECT DESCRIPTION
Kirby was appointed the main mechanical contractor for the warehouse and cleanroom installation for Meissner Filtration Products, manufacturers of medical devices.
The project involved the successful pre-fabrication of the boiler room off-site which optimised project delivery and ensured efficiency.
SCOPE OF WORK
Kirby scope of works included the installation and commissioning of mechanical services.
The mechanical systems installed by Kirby included:
• Chilled Water
• Low Temperature Hot Water
• Smoke & Heat Exhaust Ventilation
• Supply & Extract Ventilation Distribution
• VRF Air Conditioning
• Leak Detection
• BMS
• Server Room Air Conditioning
• Gas
• Oxygen
• Process Chilled Water
• Solvent / Solvent Waste
• Vacuum
• Hot Process Water
• Compressed Air
• Soils & Waste
• Domestic Water Services
Installed equipment and plant items include HEPA Grilles, Chiller, Heat Recovery Unit, Boiler , CHW Pumps, LPHW Pumps, Compressor.