PROJECT DESCRIPTION

Kirby was responsible for full design and build of all mechanical and electrical services associated with a major new Energy Centre.

A key element of design involved integrating the new utilities with existing site services while ensuring minimal interruption to plant operations while also focusing on design optimisation and value engineering. The construction scope included the installation and commissioning of all mechanical and electrical services.

As well as adding utilities capacity, the Energy Centre also reduced site energy consumption by 20%, through greater effciency derived from GEA’s energy technologies.

SCOPE OF WORK

Kirby scope of works included the design, installation and commissioning of all electrical and mechanical services.

The electrical systems installed by Kirby included:

• MV Distribution
• LV Distribution
• General & Emergency Lighting
• General Service Power
• Mechanical Plant Service Power
• Fire Detection & Alarm
• Access Control, Intruder & CCTV
• Earthing & Bonding
• Voice & Data Distribution
• Lightning Protection
• Profibus

The mechanical systems installed by Kirby included:

• Chilled Water
• Low Temperature Hot Water
• Supply & Extract Ventilation Distribution
• DWS
• Leak Detection
• BMS
• Server Room Air Conditioning
• Rain Water Harvesting
• Process Chilled Water
• RO Water
• Compressed Air
• Domestic Water Services
• Soils & Wastes
• Steam
• Gas
• Brine Cooling Systems

The total project meterage consisted of 13,000m of cable, 6,000m of containment; 1,800m of black utilities pipework, 200m of copper pipework and 250m² of duct.