Terumo Aortic HV/LV Upgrade, Scotland
Project Name
Terumo Aortic HV/LV Upgrade, Scotland
Client:
Terumo Aortic
Main Contractor:
Kirby
Consultant:
Arcadis
Project:
Terumo Aortic HV/LV Upgrade
Location:
Glasgow, Scotland
Value:
£2m
Sectors:
Power and Renewables
Services:
HV/MV Services
PROJECT DESCRIPTION
Kirby completed the design and build of the HV/LV upgrade at Terumo Aortic medical supplies facility.
This included the design, supply, installation and commissioning of 11kV switchgear, transformers and LV panels.
The project was successfully delivered within a fully operational facility.
SCOPE OF WORKS
The Kirby scope of works included the design and build of the HV/LV upgrade works.
• Earthing and Bonding Build
• Control and Protection System
• MV Cable Connection System Design
• DC Battery Systems
• General and Emergency Lighting
• General Service Power
• Fire Detection and Alarm
• Lightning Protection
Installed plant items included 3 no. distribution boards, 1 no. control and protection panels, 1 no. battery system and 3 no. transformers.
The total project meterage consisted of 4,000m of cable, 30 sets of joints / terminations.