PROJECT DESCRIPTION
Kirby was appointed to complete the mechanical, electrical and instrumentation scope of works for a new peptones plant, an expansion project with significant investment which incorporates an innovative and efficient autonomous state-of-the-art facility in Basingstoke, UK.
The Kirby BIM team provided a pinpoint accurate BIM model to facilitate the offsite prefabrication.
Kirby undertook multiple large and complex lifting operations including a bespoke 4 tier stainless steel spray dryer system.
SCOPE OF WORKS
Kirby was responsible for the mechanical and electrical scope of works.
The electrical systems installed by Kirby included:
- MV Distribution
- LV Distribution
- UPS
- General & Emergency Lighting
- General Service Power
- Mechanical Plant Service Power
- Fire Detection & Alarm
- Access Control, Intruder & CCTV
- Earthing & Bonding
- Lightning Protection
- Impulse Tubing
- SCS
- DCS
- Profibus
- Scada
The mechanical systems installed by Kirby included:
- Chilled Water
- Low Temperature Hot Water
- Smoke & Heat Exhaust Ventilation
- Supply & Extract Ventilation Distribution
- Fire Suppression
- DWS
- Leak Detection
- BMS
- Steam
- Gas
- Process Waste
- Soils & Wastes
- Bioprocess Waste
- Clean In Place (CIP)
- Clean Steam
- Process Air
- Process Water
- RO Water
- Vacuum
- Hot Process Water
- Compressed Air
- Instrument Air
- Intermediate Product
Installed equipment and plant items included 1 nr. Transformer, 1 nr. UPS & Distribution Board, 1 nr. LV Board, 2 x MCC, 1 x MCB Board, 14 nr. Steel Process Valve Manifolds, 2 nr. Chillers, 3 nr. Air Handling Units, 2 nr. Buffer Vessels, 4 nr. Utility Pumps, 1 nr. Goods Lift (1000kg Capacity), 10 nr. Condensate Recovery Units and 2 nr. Heat Exchangers.
The total project meterage included 84,000m of cable, 3,400m of containment, 11,350m of pipework, 1,700 instruments and loops and 17 nr. I/O.