Wyeth Nutrition, Ireland

Project Name

Wyeth Nutrition, Ireland

Client:

Wyeth Nutritional (Nestlé)

Main Contractor:

John Paul Construction

Consultant:

Arup

Project:

New Card Project

Location:

Limerick, Ireland

Value:

€3.5m

Sectors:

Industrial

Services:

Electrical Services and Instrumentation and Mechanical Piping & HVAC Services

PROJECT DESCRIPTION

Wyeth Nutrition, an infant and maternal nutrition company which is part of Nestlé, has made an investment at its facility in Limerick as part of the New Card Project.

Kirby was responsible for the mechanical and electrical services for the new production building, administration building and the existing operational plant. A key element of this project was integrating existing site services with minimal disruption to operations.

SCOPE OF WORK

The scope of works included the installation of all electrical and mechanical services.

The electrical systems installed by Kirby included:

• LV Distribution
• UPS
• General and Emergency Lighting
• General Service Power
• Mechanical Plant Service Power
• Fire Detection and Alarm
• Access Control, Intruder and CCTV
• Earthing and Bonding
• Voice and Data Distribution
• Disabled Alarm/Refuge System
• Lightning Protection

The mechanical systems installed by Kirby included:

• Chilled Water
• Low Temperature Hot Water
• Laboratory Gases
• Smoke and Heat Exhaust Ventilation
• Supply and Extract Ventilation Distribution
• Leak Detection
• BMS
• Server Room Air Conditioning
• Clean Steam
• CO2
• Nitrogen
• Oxygen
• Process Chilled Water
• Process Waste
• Process Water
• Compressed Air
• Domestic Water Services
• Soils and Wastes

Installed electrical plant items included 6 number of LV switchgear.

Installed mechanical plant items included 3 number of AHU, 1 number of calorifier, 9 number of fans, 31 number of FCU’s, 2 number of heat exchangers, 5 number of pumps.

The total project meterage consisted of 69,000m of cable, 62,000m of containment, 2,350m of black utilities pipework, 425m of plastic pipework, 800m of copper pipework 1,000m of clean utilities pipework as well as 2,200m² of duct.